Underground Infrastructure Training and Competence Centre (UNITRACC)

Expand Your Expertise in Pipe Installation and Rehabilitation!

Start with our free Trench Protection course and progress to advanced CIPP and Spirally-Wound Pipe techniques.

Videos about the UNITRACC Platform

UNITRACC Course Offered in Partnership with BAMI-I

Course 1:Trench Protection and Pipe Installation – Free Course

Course 2: Lining with Cured-In-Place Pipes (CIPP) – Advanced Training

More Course Coming

Course 1:Trench Protection and Pipe Installation – Free Course

This course is available free of charge.
This course features elements relevant to amongst others the European continent. It includes neither tutorial services nor a final examination. 

The most common method utilized worldwide for pipeline installation is the open cut method. This is especially true for gravity pipelines. While, at first glance, the open cut method seems to be a “simple” constructon method, it becomes highly complex when used in urban areas and at large depths.

This course is divided into two parts:

  • The first part is focused on important technical knowledge on securing the trench and making it a safe work zone. It presents the many options available in this regard.
  • The second part is focused on the correct pipeline installation techniques including backfilling of the trench and the removal of the shoring.

The net learning time is approx. 3 days.

REGISTER HERE

Questions? Contact us at [email protected]

Course 2: Lining with-In-Place Pipes (CIPP)– Advanced Training

Description

Dive deep into advanced lining methods for sewer and pipe renovation. This course covers self-supporting full linings using prefabricated, locally manufactured, and hardened pipes. Learn cutting-edge techniques for trenchless pipe rehabilitation and quality assurance.

Who It’s For:

  • Designed for engineers, pipeline managers, and experienced professionals in underground infrastructure.

What You’ll Learn (5 Modules):

  • Lining with Cured-In-Place Pipes (CIPP) – Basics: Understand the fundamentals of CIPP lining.
  • Lining with Cured-In-Place Pipes (CIPP) – Processes: Learn step-by-step process execution.
  • Details on UV Curing for CIPP Installation: Gain expertise in UV-cured lining techniques.
  • Final Work, Acceptance, and Renovation Defects: Avoid common mistakes and ensure quality.
  • Lining with Spirally-Wound Pipes: Master stationary winding machine techniques without reinforcement materials.

Additional Topics:

    • Application areas, limits, and best practices.
    • Advantages, disadvantages, and common remediation errors.
    • Quality assurance strategies for long-term success.

Duration: Flexible, self-paced (5 modules).

Course Fee:

Nonmember $1200; Member:$1000

Course Fee:

Nonmember $1200; Member:$1000

REGISTER HERE

Questions? Contact us at [email protected]

Become A BAMI-I Member

Membership

Whenever comes about building a website for political campaign or promo tion or raising funds, a functional website with a necessary call to ac tions.

Corporate Membership

$950/per year*
  • Employee Engagement
  •  
  • Member-Only Exhibitor Rates At Congress
  •  
  • Professional Courses
  •  
  • Access To High-Quality Talent Pool